AI GardenPlan

Yard survey checklist: 8 measurements to take before you plan

A tape measure, a phone compass and a notebook are enough. Write every number on a rough overhead sketch.

Most garden plans fail on missing inputs, not bad taste. These eight measurements decide where paths and beds can go, which plants survive, and whether a design can be built without surprises. Take them before you choose a style or a plant.

#MeasureHow to take itWrite downWhat changes the plan
1BoundariesMeasure every side with a tape; measure both diagonals.Length, width, diagonals, fence height.If the diagonals differ by more than about a foot, the yard is not a rectangle: draw the true shape before placing beds.
2Fixed featuresFrom two corners, measure to each door, window, tap, downspout, AC unit, meter and tree trunk.Distance from both corners, plus width of the feature.Doors need clearance to swing and a path to connect; windows and AC units limit where tall plants can go.
3UtilitiesIn the US, call 811 or request a locate online before any digging. Mark the flags on your sketch.Location of marked lines and the date of the request.Buried lines rule out tree planting and footing positions; keep excavation away from marked lines.
4SlopeString between two stakes at a known distance, line level on the string, measure the drop at the far end. Drop ÷ distance × 100 = % slope.Percent slope per direction, high and low points.About 5% and up is where terraces, steps and erosion control enter the design; steeper sites need a drainage plan first.
5Sun hoursNote sun or shade for each area every 2 hours on a clear day.Hours of direct sun per bed, morning vs afternoon.Full sun is 6+ hours, part sun/shade 3–6, shade under 3. A bed's light zone sets the plant list.
6DrainageDig a hole about 30 cm (12 in) deep; fill, let drain, refill and time the drop.Time for water to disappear; where water stands after rain.Water standing for many hours means poorly drained soil: pick wet-tolerant plants or improve drainage before planting.
7SoilSqueeze test for texture (gritty, smooth, sticky), then a lab test through a local extension service for pH and nutrients.Texture, pH, organic matter, test date.pH decides which plants can take up nutrients; compacted or heavy clay needs a different planting method.
8Canopy and viewsMeasure the spread and height of existing trees; note the views you want to keep and those you want to screen.Tree spread, trunk position, view lines, prevailing wind.Canopy shade changes the light map; views determine where tall plants and seating go.

Field sheet you can copy

ItemMeasurementNotes
Side A / B / C / D
Diagonal 1 / 2
Door positions
Window positions
Taps and downspouts
AC / meter / vents
Slope % (per direction)
Sun hours (per bed)
Drainage time
Soil texture / pH
Tree spread / height
Views to keep / screen

How the numbers turn into a plan

  1. Draw the outline and fixed features to scale on graph paper (one square = 1 ft or 50 cm).
  2. Shade the sun zones and mark the slope direction and wet spots.
  3. Place hardscape first: patio, main path (about 1.2 m / 4 ft for two people), secondary paths (60–90 cm / 2–3 ft).
  4. Place trees and shrubs by mature spread, then fillers by the spacing chart.
  5. Check the plan against the field sheet once more before buying plants.

Sources: USDA Plant Hardiness Zone Map for zones, 811 for utility locates, and your state extension service for soil tests and local plant advice.

FAQ

What should I measure first in a garden?

Boundaries and fixed features. Measure each side, both diagonals, then from two corners to every door, window, tap, downspout and AC unit.

How do I measure slope without a level?

String between two stakes, a line level on the string, measure the drop. Drop ÷ distance × 100 = percent slope.

How long should a drainage test take?

Dig a 30 cm hole, fill, drain, refill and time it. Water standing for many hours means poorly drained soil.

Related guides